ITF Consult

How a readiness programme runs

Nine steps, each one handing you something you keep whether or not you continue to the next.

Steps
Nine, each with a named artifact
Stop points
End of any step, keeping what you hold
Documentation
Within a week of the gap analysis
Your time
Process owners, half a day each in the build
At handover
A readiness pack for your assessor

A readiness programme runs from enquiry through gap analysis, plan, build, embed, internal audit, close out and management review to handover. Ownership moves from us to your team across those steps. At the end you approach your own certification body with a readiness pack.

The nine steps of the readiness cycle listed with the artifact each one produces and who is doing the work, showing ownership moving from us to the client, ending at a handover line: the next internal audit runs without us.STEPWHAT YOU RECEIVEDOING THE WORK1 ENQUIRYA SCOPING CALLUS2 GAP ANALYSISA GAP REPORT, EVERY CLAUSEUS3 PLANAN IMPLEMENTATION PLAN WITH DATESUS, AGREED4 BUILDTHE DOCUMENTED SYSTEMTOGETHER5 EMBEDTRAINING AND LIVE RECORDSYOUR TEAM6 INTERNAL AUDITAN AUDIT REPORT WITH FINDINGSUS, OR YOURS7 CLOSE OUTA CLOSED CORRECTIVE ACTION LOGYOU8 MANAGEMENT REVIEWMANAGEMENT REVIEW MINUTESYOUR MANAGEMENT9 HANDOVERA READINESS PACK FOR YOUR ASSESSORYOUHANDOVER: YOUR NEXT INTERNAL AUDIT RUNS WITHOUT USAFTER HANDOVERYOU BOOK YOUR OWN CERTIFICATION AUDIT, WITH THE READINESS PACK
Nine steps, nine artifacts, one handoverOwnership moves from us to your team, step by stepSwipe to pan
01

Where programmes stall

Most readiness programmes do not fail at documentation. They stall at step five, when the documents exist and the records do not.

Writing procedures is the visible part and the easiest to buy. The part that decides an audit comes after, when your people fill in the forms, hold the meetings and log the checks. An assessor samples those records, and nobody can produce them after the fact.

So the method moves ownership to your side early. Process owners review drafts in their own words at step four, forms are designed to take seconds at the point of work, and the internal audit at step six samples your records, not ours.

The measure of the job is whether your next internal audit runs without us. If it cannot, the handover has not happened, whatever the pack says.

02

The nine steps

This is the readiness cycle, written out with the artifact and the owner at each step.

StepWhat happensWho is doing the work
1 EnquiryWhich standard, which sites, which deadline.Us
2 Gap analysisWe audit what exists against the standard, clause by clause.Us
3 PlanThe gaps sequenced into phases with owners on your side.Us, agreed with you
4 BuildPolicies, procedures, registers and records built with your people, not handed to them.Together
5 EmbedTraining, trials and the first real records produced by your own team.Your team, supported
6 Internal auditA full internal audit run the way an external auditor will run it.Us, or your trained auditors
7 Close outCorrective actions raised, actioned and verified.You, verified by us
8 Management reviewThe review meeting held and minuted to the standard's requirements.Your management
9 HandoverYou approach your own certification body, holding the readiness pack.You
03

What you hold if you stop early

Every step ends with a document. That is deliberate, because a programme you cannot leave is a programme you should not join.

01

After step 2, the gap report

Clause by clause against what exists, with effort and dependency per gap. Useful to anybody, including a different consultant.

02

After step 3, the implementation plan

Phases, owners and dates. A team with its own quality lead can run the build from here and bring us back at step 6.

03

After step 4, the documented system

Your policies, procedures, registers and forms, inside your own document control.

04

After step 6, the internal audit report

Real findings, written in three parts, before anybody external sees the system.

05

After step 9, the readiness pack

Scope, sites, process list, document index and the evidence an assessor asks for, assembled the way they ask for it.

04

How an engagement is structured

  1. 01

    Quoted once the scope is known

    The proposal for the rest of the work is written after the gap analysis, when the size of the job is known, rather than over the phone.

    After step 2
  2. 02

    A stop point at every phase boundary

    You can end the engagement at the end of any phase, and the deliverable from that phase is complete and yours.

    Every phase
  3. 03

    Named people

    You know who is doing the work before you sign, because the proposal names them.

    From day one
  4. 04

    Handover is a deliverable

    The measure of the job is whether your next internal audit runs without us. Dependency is a business model, not a service.

    Step 9
05

One programme, start to finish

A food distributor in Riyadh needs ISO 22000 for a customer contract. It has a quality lead with some time and no system.

Steps 1 to 3 are ours. The call sets the standard, the one site and the contract date. The gap analysis finds cold chain checks being done and never written down, and no hazard analysis at all. The plan names the quality lead and the warehouse supervisor as owners, with dates.

Step 4 is shared. We draft the hazard analysis and the prerequisite programmes with the supervisor on the warehouse floor, and the quality lead puts every document on the master list.

Step 5 is theirs. The team fills in the temperature logs, the cleaning records and the receiving checks. We review the records as they build, and shorten two forms that take too long to fill in at the dock.

We come back for step 6 and audit the system as an assessor would. The team closes the findings and holds its management review. At step 9 the quality lead takes the readiness pack to the certification body the company chose.

06

Questions about the engagement

Q01

What does it cost?

We quote by phase after the gap analysis, and we do not publish prices because the honest number depends on scope, sites, shifts and how much already exists. What we can tell you in advance is what drives it: the number of sites and their dispersion, how many standards are in scope, whether your records exist at all, and how much of your own team's time you can commit.

Q02

Can we do some of it ourselves?

Yes, and it usually works better. One shape: we run steps 2 and 3, your team runs 4 and 5 with us reviewing, and we come back for 6. It costs less and the system is more likely to survive.

Q03

Do you use document templates?

We start from a structure, not a blank page, and then the content is written with your process owners. A template arriving unedited on your server is how you end up with a procedure describing a factory that is not yours.

Q04

How long does the whole thing take?

Your documentation (manual, procedures, forms): within a week of the gap analysis. Then your team runs it. Before the certification audit, that means at least one internal audit and one management review, with the records to show them. You and your certification body set the pace.

Q05

We already have a consultant. Can you review their work?

Yes. A review against the standard is a legitimate piece of work and we will give you a straight answer, including when the answer is that the work is fine and you should carry on with them.

Q06

Will you attend our certification audit?

We can attend as an observer if you want us there. Your team answers the assessor's questions, because the system has to stand up when we are not in the room, which is the entire point of the method.

Step 2 is the only commitment that matters

Book the gap analysis, read the report, then decide how much of the rest you want us for. The report is yours regardless.