Everything an ITF contract puts in your hands

Every document, what is on it, when it arrives and who signs it, from the first walkthrough to the annual review.

Before you sign
Asset register · draft scope · defect list
Draft scope
Three working days after the walkthrough
Every task
A closed work order with photographs, time and name
Every month
The evidence pack, in the first week

Every ITF FM contract produces a fixed set of documents: the survey pack, the mobilisation plan, the PPM schedule, a closed work order with photographs for every task, registers per asset type, the monthly evidence pack, the review action list and the annual review note. This page shows what is on each one and when it lands.

Every document an FM contract produces, hung from the day it lands: asset register, scope and defect list at the walkthrough, the mobilisation plan at signing, the escalation matrix on day 1, the gap list by day 7, the PPM schedule by day 21, the first pack on day 30, the monthly pack and action list, and the annual review note. Below, the registers and the work order record run continuously, and one work order is opened up to show its fields and a before and after photograph taken from the same position.WALKTHROUGHASSET REGISTERSCOPE, DEFECTSSIGNINGMOBILISATIONPLANDAY 1ESCALATIONMATRIXDAY 7GAP LISTBY DAY 21PPMSCHEDULEDAY 30FIRST PACKMONTHLYPACK ANDACTION LISTANNUALREVIEW NOTEREGISTERS, UPDATED AT EVERY VISITWORK ORDER RECORD, EVERY TASKONE WORK ORDER, OPENED UPTICKET NUMBERUNIQUEASSET TAG AND LOCATIONSCANNEDPRIORITY, FIVE CLOCK TIMESIF REACTIVECHECKLIST AND VERSIONNAMEDREADINGSAS VALUESPARTS FITTEDPER ASSETTECHNICIAN, IN AND OUTNAME, TIMESUPERVISOR SIGN-OFFREQUIREDREASON IF DEFERREDWRITTENBEFOREAS FOUNDAFTER,SAME POSITIONTAG IN FRAME, TIMESTAMP KEPTNO PHOTOGRAPHS, NO CLOSURE
The paper trail, in arrival orderOne work order opened upSwipe to pan
  1. 01 Enquiry
  2. 02 Site survey
  3. 03 Scope and quote
  4. 04 Mobilisation
  5. 05 Planned schedule
  6. 06 Execution
  7. 07 Monthly report
  8. 08 Management review
  9. 09 Next cycle

Everything an ITF contract puts in your hands sits at step 7 of the fm operating cycle. You receive the monthly evidence report.

01

The work happened. The evidence did not.

Most FM disputes are not about work that was skipped. They are about work nobody can prove.

A technician serviced the unit, ticked a sheet, and the sheet went into a van. Six months later an auditor, an insurer or a tenant asks, and the answer is an apology.

So every promise on this site ends in a document. If it is not listed on this page, we do not claim it.

02

Twelve documents, in arrival order

DocumentWhat is on it, and who signsWhen it lands
Asset registerEvery critical asset: tag, class, location, condition, criticality. Signed by the ITF surveyor.After the survey, before you sign
Draft scopeLines, frequencies, exclusions and the delivery model per line. Issued by ITF.Three working days after the walkthrough
Defect listWhat we found, with photographs and a priority. Signed by the ITF surveyor.With the scope
Mobilisation planTasks, owners and dates to day 30. Agreed with you.Within days of signing
Handover gap listWhat the outgoing provider did not hand over, dated. Issued by ITF.Days 1 to 7
Escalation matrixWho is called, in what order, for each priority. Signed by ITF and your facilities lead.Day 1
Annual PPM scheduleAssets down the side, twelve months across. Drafted before mobilisation, confirmed with you after asset verification.Confirmed within two weeks of verification
Work order recordOne per task, planned or reactive. Signed by the technician and the supervisor.Every task
RegistersAsset, device, filter, emergency lighting, leak, tank, pest, chemical and vendor. Kept by the supervisor.Live, updated at every visit
Monthly evidence packThe month assembled from the work orders. Signed by the account manager.First week of the following month
Review action listDecisions with an owner and a date. Signed by both sides.After each monthly review
Annual review noteIntervals moved, assets changed, and the reasons. Issued by ITF.At the contract anniversary
03

Registers that stay live

Kept current at the visit rather than rebuilt at month end, and readable by you at any point.

01

Asset register

Every asset with its tag, class, interval and condition. Updated at every visit and every change.

02

Device register

Every fire alarm address and its last test date. Updated at every rotation visit.

03

Filter register

Size, grade and change date per unit. Updated at every filter change.

04

Emergency lighting register

Every fitting with its monthly and annual results.

05

Leak register

Every leak logged against its riser or zone, with the cause.

06

Tank record

Inspections, cleans, disinfection and sample results, per event.

07

Pest site map and trend report

Monitoring points and catch data per point, recorded every visit and trended quarterly.

08

Chemical usage log

Product, rate, area and operator for every application, with the safety data sheet.

09

Vendor register

Every contractor, their scope, their documents and the expiry dates.

04

Anatomy of the monthly pack

Generated from the work orders and in your hands in the first week of the following month, section by section.

  1. 01

    Page one

    Planned against completed, reactive calls by priority and open items by age, in one view.

    Summary
  2. 02

    Missed and deferred

    Every task that did not happen, named, with the reason and the new date.

    Exceptions
  3. 03

    The KPI page

    Each KPI counted as defined on the SLA and KPI page, with misses listed by ticket.

    Performance
  4. 04

    Repeat failures

    Assets with more than one failure in the period, with the history attached.

    Assets
  5. 05

    Defects outside scope

    Photographs, a recommendation and a priority you can put in a budget.

    Budget
  6. 06

    Parts and consumables

    Used against the allowance, per asset.

    Cost
  7. 07

    Specialists and expiries

    Visits by managed specialists, and any document expiring in the next ninety days.

    Compliance
  8. 08

    Photo appendix

    A sample of closures with their evidence, chosen by rule rather than by us picking the good ones.

    Evidence
  9. 09

    Next month

    The planned work, so you can see what is coming.

    Forward
05

A typical audit month

A food plant in Dammam 2nd Industrial City has a retailer audit in eight weeks. The last audit raised findings on pest records and on drainage, and the technical manager does not want to assemble evidence from three contractors again.

From mobilisation, the plant's FM records are filed where its technical team keeps its prerequisite programmes: the pest site map and trend report, the area cleaning schedule with its verification log, the drainage cycle record, the glass and brittle plastics register kept alongside the fabric defect list, and the chemical usage log with safety data sheets. Each month's pack goes into the same folder.

On audit day the technical manager opens one folder. The auditor asks for the pest trend since mobilisation and the verification results for the high-care area, and both are there with the dates and the names.

How an auditor judges the whole system is the auditor's call. What the plant holds is a folder where nobody is searching for a document while the auditor waits.

06

The record underneath

Inside a work order record

One per task, planned or reactive. A record missing its required photographs cannot be closed: it stays open, and it shows as open in your view.

  • Ticket number, asset tag and location
  • Priority and the five clock times, where reactive
  • The checklist used and its version
  • Readings taken, as values
  • Parts and consumables fitted
  • Photographs before and after
  • The technician's name and the times scanned in and out
  • The supervisor's sign-off
  • The reason, if the task was deferred or not completed
07

Questions about the record

Q01

Can the pack follow our format?

Yes. If your auditor, landlord or head office expects a particular layout, we map the pack to it. The record underneath does not change.

Q02

Can our auditor see the system directly?

Yes, with read access for a period you set. Some clients prefer to hand the auditor the folder instead. Both work.

Q03

What if a document on this list is missing one month?

Then that is a finding against us, and it goes on the review agenda like any other miss. The list on this page is what you should hold us to.

Q04

Who signs the work order?

The technician who did the work and the supervisor who checked it. Their names and the scan-in and scan-out times sit on the record, so a closure can be traced to a person and a time.