ITF Hygienix · Custom formulation

A formulation made to your specification

When none of the six fits the task, the partner factory's chemists work from your soil, surface, water and pack to a product made for it.

Chemists
The partner factory's own
Starts with
A written formulation brief
Lead time
The chemists', given to you in writing
Minimum batch
The factory's, stated before you commit
Registration
Responsibility agreed in writing before bench work

Custom formulation is for the task the six FORMULA products do not cover. You bring the soil, the surface, the water, the time available and the constraint. The partner factory's chemists develop against that brief, the product is trialled on your site, and it comes in a pack format agreed with you, with a label your crew can read.

Seven stages of a custom formulation in a row: brief, range check, registration split, bench work, site trial, label text, and artwork and pack. A gate stands after the range check. The highlighted route turns down at the gate into six identical packs labelled with the six Hygienix chemicals. One arrow carries on through the remaining five stages to a single new product.1BRIEFWRITTEN DOWN2RANGE CHECKAGAINST SIX3REGISTRATIONSPLIT AGREED4BENCHYOUR SOIL5SITE TRIALYOUR CREW6LABEL TEXTUSE AND PPE7ARTWORKAND PACKGATEONE NEW PRODUCTMADE TO THE BRIEFONE OF THE SIX DOES THE JOBHANDSANITISER GELSANITISINGTABLETSFOOD-CONTACTSANITISERHEAVY-DUTYDEGREASERNEUTRAL FLOORCLEANERLIQUIDHAND SOAPMOST BRIEFS END HERE, AT STAGE TWOTHE FEW THAT PASSTHE GATE IS THE RANGE CHECK. A VARIATION OF ONE OF THE SIX IS TRIED THERE TOO.MOST BRIEFS END AT THE GATE. THE ONES THAT PASS ARE WORTH DOING.
Brief to packMost briefs end at the gate after stage twoSwipe to pan
  1. 01 Enquiry
  2. 02 Zone survey
  3. 03 Zone plan
  4. 04 Supply
  5. 05 At the position
  6. 06 Verify
  7. 07 Review

A formulation made to your specification sits at step 4 of from survey to supply. You receive a bill of materials and a reorder quantity per position.

01

Most briefs should end at stage two

Most of the time, the product that solves the problem already exists, and it is quicker to get and better documented.

A custom request usually arrives as a chemistry question and turns out to be something else. The dilution station is set wrong. The water is harder than anyone checked. The contact time is thirty seconds because that is all the changeover allows. A new formulation would be developed to solve a problem that a survey solves in a morning.

So the first thing we do with a brief is try to answer it with one of the six. If one of them does the job, we say which and how it should be dosed, and the project stops there. A custom product brings a minimum batch and a lead time, and the paperwork for a new product starts from nothing.

02

Brief to pack, stage by stage

Seven stages. The registration split sits before the bench work on purpose: it is the step that decides the timeline, and it is the one people leave until the product exists.

StageWhat happensWhat you get
1. BriefThe soil, the surface, the water, the time available, the temperature you can reach, and the constraint that rules out the obvious answer.A written formulation brief
2. Range checkThe brief is tested against the six, and against a variation of one of them. If either does the job, the project stops here.A written recommendation, or a decision to continue
3. Registration splitWhich registrations the product needs, who holds them and who files them. Agreed before any bench work, never after.A written responsibility split
4. Bench workThe partner factory's chemists develop against the brief, on your soil rather than a laboratory standard.A bench sample and the chemists' report
5. Site trialRun on your line, in your shift window, by your crew. Most formulations change here, and some fail.A trial record with the result and the changes made
6. Label textThe use instructions the chemists set from the bench and trial results: the method, the dilution, material cautions and PPE.Label text, agreed before any artwork
7. Pack and artworkPack format, closure, hazard panel, and the label in the languages your crew reads.Approved artwork and a production pack
03

The paper trail you keep

01

The formulation brief

Your problem written as a specification: soil, surface, water, time, temperature and the constraint. Worth having even if the project stops at stage two.

02

The range check

Which of the six was tested against the brief, and why it did or did not do the job.

03

The registration split

Who holds each registration the product needs and who files it, signed before the chemists start.

04

The chemists' bench report

What was tried on your soil, what worked, what did not, and why the chemists went the way they went.

05

The trial record

The run on your own site: conditions, result, the changes made, and who signed it off.

06

Approved label artwork and a production pack

The label your crew reads, with its hazard panel, on the pack format you agreed.

04

Limescale on marble, near Khobar

An FM contract covers a residential compound near Khobar with forty washroom blocks on tanker water.

Limescale builds on basins, taps and urinals within weeks. None of the six is an acid descaler, and several vanity tops are marble, which acid etches.

The brief records the soil as scale, the surfaces as chrome, vitreous china and marble, the water as hard tanker water, and the constraint as "must not touch the marble". The range check confirms none of the six does the job. The registration split is agreed in writing before bench work starts. The partner factory's chemists produce a bench sample. The site trial runs on two blocks over two weeks, and the label gains a line after the trial: apply to a cloth, never spray near stone. The label text follows, then the artwork with a stone warning in the hazard panel.

The contractor holds the formulation brief, the registration split, the chemists' bench report, the trial record and approved label artwork. The descaler joins the plan's chemical specification for the washroom zone.

05

Deciding whether custom is worth it

Four briefs that survive the range check

Each of these is a problem the six cannot answer, rather than one they have not been pointed at properly.

  • A soil the usual products ignore, often a residue specific to your process
  • A surface material the usual chemistry attacks, where the damage is already on record
  • A customer specification with a named constraint, such as fragrance-free or chlorine-free across a whole site
  • A pack or dispensing format nobody makes, where the format is the real blocker
06

Before you write a brief

Q01

Who does the chemistry?

The partner factory's own chemists. We write the brief, set up the trial on your site with your crew, and produce the records and the label artwork around the product.

Q02

Can you guarantee the product will pass our customer's audit?

No one honestly can. What we build in from the start is the evidence an auditor asks for: the trial record, the check named against the product in your zone plan, and the record that check lands on.

Q03

How long does it take?

The chemists set the bench time, and we give you their lead time in writing. A site trial adds at least one full cleaning cycle and usually two. Registration, where it applies, is the long step, which is why the split is agreed before bench work starts.

Q04

What happens to the brief if we do not go ahead?

You keep it. It is a written specification of your cleaning problem, useful whoever you buy from.

Q05

Can you change one of the six instead?

Often, and it is usually the faster route. A variation, such as a fragrance-free version, starts from a recipe the chemists already know.

Send the problem, not the product idea

A chemistry question is often a dosing, scheduling or water question underneath, so the brief starts with the process rather than with the bottle.

Start a formulation brief