ITF FM

Questions buyers ask before signing

The commercial answers, including the ones that lose us work, each linked to the page that answers it in full.

Pricing
Quote only, after a walkthrough
Walkthrough
Typically within five working days
Signing to day one
Typically two to four weeks
Contract
Annual, reviewed monthly
Coverage
Based in Riyadh, on site across Saudi Arabia.

Most enquiries want four things: what it costs, how fast you start, who does the work and what happens when it goes wrong. Price is quote-only after a walkthrough, day one is typically two to four weeks after signing, and the rest is below.

Six symptoms a facilities buyer describes on the phone on the left, routed through a single site survey in the middle, and out to the six FM lines that answer them on the right.THE SYMPTOMWHAT IT POINTS ATSAME FAULT, THIRD TIMEAUDIT FINDING ON RECORDSCOMPLAINTS ABOUT CLEANINGNOBODY KNOWS WHO IS ON SITESUMMER COOLING FAILURESFIVE VENDORS, NO OWNERTHE SURVEYREGISTER, DEFECTSPLANNED MAINTENANCEEVIDENCE OSCOMMERCIAL CLEANINGVENDOR MANAGEMENTHVACO AND M CONTRACTEVERY ROUTE RUNS THROUGH THE SAME SURVEYEVERY SURVEY PRODUCES AN ASSET REGISTER AND A DEFECT LIST
What your problem points atStart from the symptom, not the service listSwipe to pan
01

Two answers that cost us work

These come up in most first calls, and giving the comfortable answer to any of them would cost you more than it costs us.

No, we will not price your building over the phone. A number given before a walkthrough is a number that moves later, usually through variation orders, and everyone in the conversation knows it. The survey exists so that the quote can be real.

No, cheaper headcount is not a saving. Most FM bids are compared on people and hours, which means the lowest number wins and the building deteriorates in month three when the roster turns out to be theoretical. Compare the scope and the evidence discipline instead, including ours.

02

What actually moves the number

Pricing is quote-only by standing policy, so instead of a rate card here is what changes the figure. If you understand these six, you can read any FM quote, including a competitor's. The full list, with the honest lever on each, is on the pricing page.

DriverWhy it moves the price
Asset count and conditionNot floor area. Twenty well maintained assets cost less to run than eight neglected ones, and the survey is what tells the difference.
Frequency and coverage hoursA day presence, a night crew and an on-call response are three different costs. Most savings come from getting these right rather than from cutting rates.
Access and windowsWork that can only happen during a shutdown, at height or under permit costs more per hour than the same work done in normal access.
Response targetsA two hour target and a next working day target are different staffing models. Buy the tight target where downtime is expensive, not everywhere.
Materials and consumablesWhether you hold the budget or we do, and where the threshold sits for coming back to you with a quote.
Evidence requirementsA site audited by SFDA, a customer or an accreditation scheme needs more record keeping than a private office, and that is real work rather than an add-on.
03

What you get before you sign anything

The survey produces these three documents before any contract is signed.

01

The asset register

Every critical item on your site with its location, class and condition. Most buildings do not have this and cannot rebuild it quickly.

02

The draft scope

What we would put on a schedule, at what frequency, with what left deliberately out and why.

03

The defect list

What we found while walking your building, with photographs. Some of it will be things you would rather we had not noticed.

04

The rest of it

Q01

Do we have to hand over the whole building?

No. Start with one line, usually cleaning, pest control or MEP maintenance, and expand when the evidence earns it. Full O&M contracts, single service lines and fixed-term programmes all exist, and the evidence discipline is identical in each.

Q02

Who actually does the work?

Our own rostered, supervised staff on self-delivered lines. Specialist lines such as lifts and fire suppression are managed specialist work: a licensed specialist does it, and we write the scope, supervise the visit and keep their records in your file. Either way you see the whole evidence trail, including the parts where a task was missed. The services page marks which line is which.

Q03

What does audit-grade mean, concretely?

Four things you can check. Every task has a checklist written before anyone is rostered against it. Every closure carries a photograph and a timestamp. The monthly report is generated from the record rather than written at month end. And the monthly review produces an action list with owners and dates. If a provider claims the phrase and cannot show you those four, it is a slogan.

Q04

What happens if the service goes wrong?

You will usually see it in our own record before you see it in the building, because the completion rate and the response times are reported whether they flatter us or not. Then it goes on the review agenda with a cause and an action. Commercial remedies are agreed in the contract rather than advertised on a website, since they differ by site.

Q05

What records does the contract produce?

A closed work order with photographs for every task, a register per asset type, and a monthly pack generated from that record. The page on what you receive shows each document and when it lands.

Q06

How fast can you start?

Day one is typically two to four weeks after signing, with reactive cover live from that day. The timelines page has every step from the first call, and the mobilisation page covers the first 30 days.

Q07

How fast do you respond?

Per priority and per site, set in the contract against what each asset's failure costs you. The SLA and KPI page shows the priority ladder and when each clock starts.

Q08

Where do you work?

Based in Riyadh, on site across Saudi Arabia. Tell us the city when you get in touch, and the scoping call sets the walkthrough date.

Book a site survey

If a question here was not answered, ask it at the survey, which also produces the register and the defect list.

Book a site survey