How long each step actually takes

From the first call to the first monthly pack, with the lead time for each service and the things that make dates slip.

Scoping call
Typically within one business day of enquiry
Walkthrough
Typically within five working days
Scope and quote
Typically three working days after the walkthrough
Signing to day one
Typically two to four weeks
First monthly pack
Day 30

From first call to a running contract usually takes three to six weeks, plus your own approval time: a scoping call within one business day, a walkthrough within five working days, the scope and quote three working days after it, then two to four weeks from signing to day one. The first monthly pack lands on day 30.

Two timelines from first call to day 30. The first, for an ordinary site: scoping call within one business day, walkthrough within five working days, scope and quote three working days later, the client's approval time, signing, day one two to four weeks after signing, assets tagged by day 7, SLA review on day 21 and the first monthly pack on day 30. The second, for a Royal Commission site in Jubail, is the same to signing and then waits on passes and inductions before day one.STANDARD SITEYOUR APPROVALFIRST CALLSCOPING CALLWITHIN 1 BUSINESS DAYWALKTHROUGHWITHIN 5 WORKING DAYSSCOPE AND QUOTE3 WORKING DAYS LATERSIGNEDDAY ONE2 TO 4 WEEKS AFTER SIGNINGDAY 7TAGGEDDAY 21SLA REVIEWDAY 30MONTHLY PACKJUBAIL, ROYAL COMMISSION SITESAME STEPS TO SIGNINGSIGNEDPASSES AND INDUCTIONSDAY ONEDAY 30STARTED THE DAY SCOPE IS AGREEDTYPICAL DATES, CONFIRMED AT THE WALKTHROUGH. NOT TO SCALE.WHAT MAKES IT SLIPPASSES AND VISASLATE RECORDS FROM THE OUTGOING PROVIDERSIGNATURES WAITING ON YOUR SIDEPEAK-SEASON SPECIALISTS, LONG-LEAD PARTSAFTER DAY 30MONTH 3FIRST QUARTERLY TREND REVIEWMONTH 12EVERY ANNUAL TASK DONE ONCE
First call to day 30Typical dates, and where they stretchSwipe to pan
  1. 01 Enquiry
  2. 02 Site survey
  3. 03 Scope and quote
  4. 04 Mobilisation
  5. 05 Planned schedule
  6. 06 Execution
  7. 07 Monthly report
  8. 08 Management review
  9. 09 Next cycle

How long each step actually takes sits at step 4 of the fm operating cycle. You receive a mobilisation plan with dates.

01

What makes dates slip

Most slips come from steps that neither side controls alone, which is why the plan names the slowest one on the first page.

Site passes, inductions and permits in Jubail, which is why we start them the day scope is agreed. Visas for new staff. Records from the outgoing provider arriving late or not at all. Approvals on your side, such as a method statement waiting for a signature. Specialist availability in peak season. Parts with long lead times.

A mobilisation date given before anyone has seen the building is a guess, and so is a start date inside Jubail before the passes are issued. When a step slips, the plan shows it with its new date and the reason beside it.

02

Enquiry to steady state

Typical timings, confirmed at the walkthrough. The steps marked as your timetable are yours to set.

StepWhat you holdTypically
Scoping callA walkthrough date and the name of who is coming.Within one business day
WalkthroughNotes on the day; the register follows with the quote.Within five working days
Scope and quoteAsset register, draft scope, defect list and a fixed monthly quote.Three working days later
Your decision and signatureThe contract and its annexes, written against the scope above.Your timetable
Day oneReactive cover starts and the escalation matrix is issued.Two to four weeks after signing
Assets verified and taggedThe verified register and the handover gap list.Day 7
Annual PPM scheduleEvery planned task placed on a calendar per asset.Within two weeks of verification
First SLA reviewA review note written over real records, not the proposal.Day 21
First monthly packThe month assembled from the record: done, failed, due.Day 30
First quarterly trend reviewRepeat faults and completion trends across three months.Month 3
Annual review noteEvery annual task done once, and what the year changed.Month 12
03

What you hold along the way

01

The dated plan

Walkthrough to day 30, one line per step, with the slowest step named and the date it depends on.

02

The access and induction tracker

Per person: passes applied for, inductions booked and completed. It matters most on gated and Royal Commission sites.

03

The handover gap list

What the outgoing provider owed and did not hand over, issued on day 7 with the verified register.

04

The first monthly pack

Day 30: the first month from the record, including anything that slipped and why.

04

Lead times by service

Typical lead times from scope agreement or survey, per line. A combined contract runs its lines in parallel, so the longest one sets the date.

  1. 01

    Pest control

    The first survey of the site, which sets the monitoring-point map.

    Within one week of scope agreement
  2. 02

    Sanitation and disinfection

    The first documented cycle per area.

    Within one week of scope agreement
  3. 03

    Commercial cleaning

    Mobilisation of the rostered team.

    Two weeks from scope agreement
  4. 04

    Support staffing

    Rostered site staff in place. The range depends on visa status.

    Two to three weeks
  5. 05

    MEP and industrial cleaning

    The method statement for your approval.

    Five working days after survey
  6. 06

    Planned maintenance, HVAC, electrical, fire alarm

    The schedule, board schedule or zone chart for the line.

    Within two weeks of survey
  7. 07

    Vendor management

    The register of every contractor on site, with document expiries.

    Within three weeks of survey
05

A contract ending next month

A logistics company's FM contract expires at the end of next month, and the board approved the change late.

From the scoping call, the walkthrough happens four days later and the quote three working days after that. The client signs within the week.

Because the site is in Dammam, not a Royal Commission city, access is not the constraint; staffing is, and one position waits on a visa. Day one lands on the contract changeover date with that position covered from the cover pool until the new starter arrives. The client holds the dated plan with the visa named as the slowest step.

06

Questions about dates

Q01

Can you start faster?

Sometimes, on a small scope with no access constraints. We say so at the walkthrough rather than promising it on the first call.

Q02

Why does Jubail take longer?

Site passes, permits and plant inductions, which are issued by others. We start them the day scope is agreed.

Q03

Can reactive cover start before the full scope?

Yes. Reactive cover is live from day one, while the register, tagging and planned schedule are still being built.

Q04

When is the first full PPM cycle complete?

When every annual task has been done once, which is month 12. The annual review note is written then.

Put a date on the walkthrough

The walkthrough is where these estimates become your dates, with the slowest step named.