ITF Consult

Support between certification audits

A scheduled year of internal audit, review preparation and document upkeep, so the system keeps running between certification audits instead of being rebuilt before each one.

Rhythm
A dated visit every quarter
Internal audit
Once a year, across the scope
Management review
Input pack prepared before each one
Before each visit
A pre-surveillance review of the records
Certificate cycle
Three years, with surveillance audits between

Surveillance support is a recurring arrangement covering the period between certification audits. It typically includes a scheduled internal audit, management review preparation, document updates and a pre-surveillance check, so the system is maintained rather than rebuilt before each visit.

The three-year certificate cycle from certification through two surveillance audits to recertification, with the first year drawn out below it twice: once with four quarterly visits for a check-in, the internal audit, the management review pack and a pre-surveillance review, plus document updates when something changes, and once left alone, where records lapse and the year ends in a last-month scramble.THE CERTIFICATE CYCLECERTIFICATIONSURVEILLANCE 1SURVEILLANCE 2RECERTIFICATIONTHE YEAR BETWEEN, DRAWN OUTWITH SUPPORTCERTIFIEDSURVEILLANCE 1Q1Q2Q3Q4CHECK-INACTIONS AND RECORDSINTERNAL AUDITACROSS THE SCOPEREVIEW PACKINPUTS AS TRENDSPRE-SURVEILLANCECHECK, THEN CLOSESHORT TICKS: DOCUMENT UPDATES, WHEN SOMETHING CHANGESLEFT ALONETHE LAST-MONTH SCRAMBLERECORDS LAPSE, ACTIONS UNVERIFIEDWHAT THE AUDITOR SAMPLES, AND WHAT YOU HOLDTHE AUDITOR ASKS FORINTERNAL AUDITTHIS CYCLE'S REPORTMANAGEMENT REVIEWMINUTED, WITH ACTIONSCORRECTIVE ACTIONSVERIFIED, WITH EVIDENCEDOCUMENTSCURRENT REVISIONSYOU HOLDSTATUS NOTEEVERY QUARTERAUDIT REPORTONCE A YEARREVIEW PACKBEFORE EACH REVIEWUPDATED DOCUMENTSON THE MASTER LIST
The year between visits, kept on scheduleAgainst the same year left alone and rebuilt in the last monthSwipe to pan
01

Built for the certificate, then left

The system is built for certification, then left alone. A month before surveillance the team scrambles to produce a year of records.

It happens for ordinary reasons. The person who ran the project goes back to their real job. Internal audits slip a quarter, then two. Corrective actions are raised and not verified. The management review waits for a date that suits everyone.

By the time the surveillance date is fixed, records that should have built up over twelve months have to be produced in weeks. Records written in a rush look written in a rush, and an auditor who notices samples harder.

The fix is not effort before the visit. It is a calendar that nobody can quietly move, held by somebody outside the team.

02

What the year includes

ElementWhat happensWhen
Quarterly check-inA visit to review open corrective actions, records due and changes since the last visit, ending in a written status note.Every quarter
Internal auditA full internal audit across the scope, run by us or by your own trained auditors with our preparation.Once a year
Management review preparationThe input pack built from the year's records, with trends and the decisions they point to.Before each review
Document updatesProcedures, forms and registers revised when a process, a site, a regulation or a standard changes, then issued under control.When something changes
Pre-surveillance reviewThe records an auditor is likely to sample checked in advance, and anything missing raised while there is time to close it properly.Before each visit
03

What lands on your desk through the year

01

The quarterly status note

One page per visit: open actions, records due, changes to handle and who owns each item.

02

The internal audit report

Findings in three parts with evidence identifiers, and a follow-up date for each corrective action.

03

The review input pack

The year's performance as trends against targets, ready for top management to decide on.

04

Updated documents

Revised, approved and reissued on the master list, with the old revisions withdrawn from use.

04

Setting up the year

  1. 01

    Read the last audit

    Your last certification audit report, its open findings and the date of the next visit set the calendar.

    At the start
  2. 02

    Fix the dates

    Quarterly visits, the internal audit and the management review dated for the year and agreed with the people who have to attend.

    At the start
  3. 03

    Run the quarters

    Each visit ends with a status note. Anything that slipped carries to the next visit with an owner.

    Every quarter
  4. 04

    Check before the visit

    The pre-surveillance review, timed to leave room to close what it finds.

    Before surveillance
05

Six months after the certificate

A company passed its certification audit and then watched its records lapse within six months.

The internal auditor had moved to another role. Two corrective actions from the certification audit were closed on paper and not verified. The management review had no date.

We set a quarterly visit. The first one lists every record that should exist by now and every action still open, each with an owner. The internal audit is dated for the second quarter and the review for the third, with the pack built from the audit's output.

Before surveillance, the pre-surveillance review checks the records an auditor is likely to sample. Anything it finds is raised as an ordinary finding and closed on the ordinary schedule, rather than rewritten in the week before the visit.

06

Before you commit to a year

Q01

Is this a retainer?

It is a fixed schedule for the year with the visits dated in advance. You know what happens in each quarter and what you receive from it.

Q02

Does this mean surveillance will go well?

It means the records exist, the actions were verified and the system was checked recently. What the auditor concludes is for the auditor to decide.

Q03

What if we change something mid-year?

Tell us at the next visit or before. A new site, process, product or regulation usually means document updates, and sometimes a change to the certificate scope, which you raise with your certification body.

Q04

Can the ISO 9001:2026 transition run inside the same year?

Yes. The updated documents are issued under control like any other change, and the internal audit and review are planned to cover the new requirements before the transition audit.

Put the year on a calendar

Send us the date of your next surveillance audit and your last audit report. We will lay out the year and show you what each visit covers.

Book a support call