ITF Industries

Food factories and central kitchens

The HACCP plan, the pest and cleaning programmes, the hygiene chemicals, the handler training and the CCP logs often come from five different suppliers, and the inspector reads them as one file.

A Saudi food manufacturer answers to SFDA for its operating licence and to its customers for whatever scheme their contract names. Both read the same file: the HACCP plan, the prerequisite programmes and the records behind them. Five ITF divisions write into that file as one company, to one records standard, so it reads as one system.

Five coloured lines, one per division, converge into one file. ITF Training writes the training register by person; ITF FM the pest map and the drainage cycle; ITF Hygienix the zone plan and dilution charts; ITF Digital the CCP logs and missed checks; ITF Consult the HACCP plan and the prerequisite programme set. They meet in your prerequisite programme file, one format, in your name. Two readers open it: SFDA's inspection, which is unannounced, and the customer audit against the scheme the contract names. Below: one company to register, one records standard.FIVE DIVISIONS, ONE FILEITF TRAININGTRAINING REGISTER BY PERSONITF FMPEST MAP, DRAINAGE CYCLEITF HYGIENIXZONE PLAN, DILUTION CHARTSITF DIGITALCCP LOGS, MISSED CHECKSITF CONSULTHACCP PLAN, PRP SETWHAT BOTH READERS OPENYOUR PREREQUISITE PROGRAMME FILEONE FORMAT, IN YOUR NAMESFDA INSPECTIONUNANNOUNCEDCUSTOMER AUDITCONTRACT SCHEMEONE COMPANY TO REGISTER, ONE RECORDS STANDARD
Five divisions, one prerequisite fileBoth readers open the same fileSwipe to pan
01

Five suppliers, one prerequisite file

A food plant's technical manager spends part of every week refiling other people's paperwork. The pest contractor's visit report arrives in its own layout and has to be matched to the site map in your prerequisite programme. The cleaning crew brought its own chemicals rather than the ones on your approved list. The fryer CCP log was filled in at the end of the shift, from memory, in one pen. Last month's handler hygiene session happened, and the attendance sheet is still in a drawer. Each of those is a control that slipped and a record that cannot show otherwise, and the file is what an unannounced SFDA inspection and a retailer's auditor both come to read.

  • Pest, cleaning and drainage records kept in each contractor's format instead of the one your HACCP documentation names
  • A sanitiser decanted into an unmarked container, and a dilution station still set for a product the site stopped buying
  • A missed CCP check left blank rather than recorded as missed
  • Training delivered and never recorded against the person who attended
  • A mock recall that takes most of a day because batch and supplier lot live in different places
02

What each division writes into it

Start with the programme your last finding named. The division you add next keeps its records the same way, so nothing has to be refiled.

03

Who reads the file

None of these obligations comes from us. What changes is whether the record is in the building, in your format, on the day someone reads it.

RequirementWhat it means on site
SFDA operating licenceApplied for through Ghad after prior approvals from other authorities. Valid one to three years, and renewed against an inspection of the facility.
A HACCP certificate from an accredited bodyListed in SFDA's licensing guide, published February 2025, among the documents a food manufacturer's licence requires. You choose the certification body.
Unannounced inspectionSFDA's inspection looks at whether HACCP is present and effective, and whether products can be traced. The evidence has to be in the building.
Prerequisite programmesPest control, cleaning and sanitation, water, waste, maintenance and fabric. Assessed as part of your system, whoever did the work.
Traceability and recallOne step back and one step forward at minimum, with a recall procedure and a designated area for withdrawn product.
Customer schemesWhatever the contract names. A GFSI clause means FSSC 22000, BRCGS, IFS or SQF, and ISO 22000 on its own does not clear it.
04

Before you hand over a second programme

Q01

Do we have to use all five divisions?

No. Start with the programme your last finding named. The division you add next keeps its records to the same standard, so its output files beside the first without being reformatted.

Q02

Who owns the records?

You do. Plans, registers and records are issued in your name and filed in your own prerequisite programme folder. Your technical team approves what goes into the file, and a named person in QA decides what happens to any batch after a deviation.

Q03

If ITF FM cleans our site, does it switch to Hygienix products?

Only if your technical team approves them. On a food site the approved chemical list is yours, and ITF FM works from it. Where a change is proposed, the data sheet and the reason go to your technical team first.

Q04

Do you issue the HACCP certificate?

No. ITF builds the plan and the records behind it. The certificate comes from an accredited certification body you choose and approach on your own schedule.

Q05

What does a typical engagement look like?

A central kitchen in Dammam supplies chilled meals to a retail chain whose auditor is due in ten weeks, and its last visit found drainage problems and training records nobody could match to staff. ITF Consult checks the HACCP plan against the process as it runs today and redraws the flow diagram. ITF FM resurveys the pest programme and puts the floor drains on a documented cycle, and ITF Hygienix walks the kitchen with the night crew and writes the zone plan. ITF Training runs handler hygiene for each shift, and ITF Digital moves the cooking and chilling checks onto a tablet. The kitchen ends up holding the revised plan, the pest site map, the zone plan, a training register by shift and its CCP records, filed in one folder.

Q06

Will the records satisfy an inspector?

They are built to what an inspection reads: a current site map, a record per visit, CCP readings stamped with a time and a name, and corrective actions closed with evidence. Nobody can promise how an inspector will judge your whole system. What changes is that nothing has to be assembled on the day.

Start from your last audit report

Its findings tell us which divisions the work belongs to. We read it with you, say which one starts, and name the records the others will have to agree with.

Send your last audit report