FM scope builder
Pick your building and your services, and get back the scope lines plus the boundary questions your contract has to answer before it goes to tender.
Choose a building type and the services you need. The builder returns a scope split into hard, soft and specialist work, the boundary question each line forces the contract to answer, an SLA priority skeleton and a mobilisation deliverable list you can copy.
This assembles a starting point, not a contract. It runs in your browser: copy the outline with the button, or print the page. Every output line still needs a decision from you, and the boundary questions are the ones worth taking to a lawyer rather than resolving by assumption.
Tenant-facing, so front of house and helpdesk carry as much weight as the plant room.
A typical set is pre-selected for the building type. Add what you have and remove what you keep in house, because a scope line you do not want priced is a scope line somebody prices anyway.
Hard services
Plant and building systemsSoft services
Services delivered by peopleSpecialist and statutory
Usually subcontracted, always certificatedSection 2 is the part worth arguing about internally before anyone drafts a clause. Every line below is a decision that will otherwise be made for you, in year two, by whoever shouts loudest.
FM SCOPE OUTLINE · Office tower
1. SCOPE OF SERVICES
Hard services
- HVAC, chillers and air handling
- Electrical distribution and lighting
- Plumbing and drainage
- Fire detection and suppression
- Lifts and escalators
- BMS and controls
Soft services
- Cleaning
- Manned guarding and access control
- Pest control
- Waste management
- Helpdesk and CAFM
Specialist and statutory
- Lifting equipment examination
2. BOUNDARY QUESTIONS THE CONTRACT MUST ANSWER
HVAC, chillers and air handling
Planned only, or planned plus reactive? Who funds a compressor or coil replacement, and above what value does it become the client's capital?
Electrical distribution and lighting
Who holds the authorised person appointment for switching, and is thermographic survey inside the fee or a variation?
Plumbing and drainage
Where does a blockage stop being maintenance and become a drainage contractor call-out, and who pays for jetting?
Fire detection and suppression
Who holds the statutory certification and the relationship with Civil Defence, and who funds remedial works arising from an inspection?
Lifts and escalators
Does the cover include replacement of major components, or servicing and minor parts only? That one decision is the biggest single price variable in a lift bid.
BMS and controls
Who owns the BMS licences and the head-end, and does the contractor get write access or read-only?
Cleaning
Output specification or input specification? Headcount buys attendance. An output spec buys a result and can be measured.
Manned guarding and access control
Who holds the security licence, who owns the CCTV data and its retention period, and what is the escalation route at three in the morning?
Pest control
Programme or call-out? A programme has a monitoring point map, trend data and records an auditor can read. A call-out has an invoice.
Waste management
Who holds the waste transfer documentation, and does segregation reporting form part of the monthly report?
Helpdesk and CAFM
Whose CAFM, and who owns the data in it? If the contract is silent you find out at exit, and the next tender is as blind as this one.
Lifting equipment examination
Statutory examination by a competent person. Who appoints them, and who closes the defects they raise?
3. SLA PRIORITY SKELETON · set your own response and resolution times
P1 Safety, security or total loss of a critical service
Response: ____ Resolution: ____
P2 Significant impact on operations or on a single critical asset
Response: ____ Resolution: ____
P3 Localised fault with a workaround available
Response: ____ Resolution: ____
P4 Cosmetic, or work that can be batched into planned activity
Response: ____ Resolution: ____
Define separately: when the clock starts, the working-hours calendar,
and the exhaustive list of valid pauses.
4. MOBILISATION DELIVERABLES
- Verified asset register, walked and reconciled rather than inherited from the tender pack
- CAFM configured and loaded, with the asset hierarchy agreed in writing
- PPM schedules built from manufacturer and statutory intervals, not a generic library
- Critical spares list agreed and stock held
- Permits and statutory certificates transferred into the incoming provider's name
- Manpower recruited or transferred, inducted and site-familiar
- HSE documentation submitted and approved
- Go-live sign-off, with anything incomplete carried as a named open item
5. THE THREE CLAUSES THAT CAUSE MOST DISPUTES
- The repair versus replace boundary, stated per asset class as a value and a scope
- The SLA clock: when it starts, the working-hours calendar, and the exhaustive list of valid pauses
- CAFM data ownership, the export format, and the right to extract on request rather than only at exit
Assembled with the ITF FM scope builder. A starting point, not a contract.About the builder
Is the output a contract?
No. It is a scope outline and a list of questions, which is what a tender document needs before anybody drafts clauses. Treat it as the agenda for the conversation with your legal adviser, not as a substitute for one.
Why does every line come with a question?
Because the question is the part that gets left out. A scope line saying HVAC is agreed by everyone and priced differently by everyone. A scope line saying HVAC, planned plus reactive, with replacement above a stated value sitting with the client, gets four comparable bids.
Does it include prices or response times?
No. Response and resolution times depend on the criticality of your estate and on definitions you have to set, and borrowed numbers with undefined terms are unenforceable. The builder gives you the priority skeleton to fill in rather than numbers to copy.
What about penalties?
Deliberately absent. A new Government Tenders and Procurement Law was published on 4 September 2026 and takes effect 2 January 2027, with implementing regulations still pending, so any cap quoted today may be from the outgoing regime. Take that one from the instrument governing your contract.
We have an incumbent contractor. Does this still help?
Often more. Run it against your current agreement and see how many boundary questions your contract does not answer. That list is why the monthly meeting is difficult.
Read next
What is in a Saudi FM contract
The eight parts, the SLA clock definitions, and the three clauses that cause most disputes.
Read moreITF FMIntegrated facility management
Hard, soft and specialist run as one programme with one accountable party.
Read moreITF FMPlanned maintenance
Where PPM schedules come from, and why a generic library is not one.
Read moreITF FMVendor and subcontractor management
The specialist layer, and who holds the statutory certificate when it is subcontracted.
Read moreTake the boundary questions to the table
A scope everyone reads the same way is worth more than a tight penalty clause. Bring the output to us with your asset list and we will tell you which lines will cost you an argument in year two.