ITF FM

One register for every contractor on site

Assessment, documents, scope and performance for the specialists you keep, held in one register with the expiry dates visible.

Covers
Lifts, suppression, HV, generators, waste, specialists
Tracked per vendor
Documents, scope, visits, findings, expiry
Reporting
One consolidated view, monthly
Register built
Within three weeks of survey
Coverage
On site across Saudi Arabia

Vendor management is the discipline of knowing who is on your site, what they are contracted to do, whether their documents are current, and whether they did it. Most buildings have the contractors and not the register. ITF builds the register within three weeks of survey and runs it monthly.

The shared facility section with the vendor management layer drawn on it: the four assets on the site that sit under specialist contracts, each numbered against its row in the register, with the fire system highlighted because its certificate is the one being chased.SECTION A-A / SAME SITE, ONE LAYER SHOWNL3L2L1B1YARD AND PERIMETEREXTERNAL1234CHILLERLIFTFIRE SYSTEMGENERATOREVERYTHING ELSE ON THISDRAWING IS ITF SCOPETHE VENDOR REGISTER01 CHILLERVISIT AND REPORT02 LIFTSTATUTORY INSPECTION03 FIRE SYSTEMCERTIFICATE DUE04 GENERATORLOAD TEST RECORDSCOPE, DATE DUE, DOCUMENTCHASED BYITF, NOT BY YOUA SPECIALIST CONTRACT STAYS A SPECIALIST CONTRACT. THE TRACKING DOES NOT STAY YOURS.THE FAILURE IS NEVER THE VENDOR. IT IS THAT NOBODY OWNED THE DATE THE DOCUMENT EXPIRED.ONE SITE, DRAWN ONCE. EVERY FM PAGE SHOWS THE SAME BUILDING WITH ONE LAYER ON IT.
The specialist layerWhich asset belongs to whose contractSwipe to pan
A contractor register listing five specialist vendors against their contract, commercial registration, insurance, competence evidence and attendance, with one insurance policy flagged as expiring and the action taken against it.CONTRACTREGISTRATIONINSURANCECOMPETENCEATTENDANCELIFT MAINTENANCEHELDCURRENTCURRENTHELDMONTHLYFIRE SUPPRESSIONHELDCURRENTEXPIRESHELDQUARTERLYGENERATOR SPECIALISTHELDCURRENTCURRENTCHASEDMONTHLYWASTE CONTRACTORHELDCURRENTCURRENTHELDWEEKLYWATER TREATMENTHELDCURRENTCURRENTHELDQUARTERLYEXPIRY DATES SIT ON A CALENDAR, NOT IN A FOLDERTHE FIELD NOBODY FILLS INOPEN RECOMMENDATIONS FROM PAST VISITSCARRIED WITH AN OWNER AND A DATETHE LIST THAT MATTERS AFTER AN INCIDENTFIRE SUPPRESSION / ACTION RAISEDREMINDERAHEAD OF EXPIRYSITE ACCESSHELD UNTIL RENEWED
The vendor registerFive vendors, one expiring documentSwipe to pan
  1. 01 Enquiry
  2. 02 Site survey
  3. 03 Scope and quote
  4. 04 Mobilisation
  5. 05 Planned schedule
  6. 06 Execution
  7. 07 Monthly report
  8. 08 Management review
  9. 09 Next cycle

One register for every contractor on site sits at step 8 of the fm operating cycle. You receive an action list with owners and dates.

01

Nobody can name all of them

Ask a facilities team to list every contractor with access to their building. Most get to six and then start guessing.

The lift company, the fire suppression company, the generator specialist, the waste contractor, the pest provider, the water treatment company, whoever services the automatic doors. Each was appointed at a different time by a different person, several predate the current team, and at least one is still attending on a contract nobody can find.

The consequences are not dramatic until they are. A visit that stops happening and nobody notices for a year. A certificate that expired during a handover. A contractor working at height on your roof with an insurance policy that lapsed in March.

Building the register is dull work and it is the highest value week anyone can spend on a building's compliance position.

02

What the register holds

FieldWhy it is thereReviewed
Contract and scopeWhat each vendor is actually engaged to do, at what frequency, with the document reference. The commonest gap is a scope nobody has read since signature.Annual
Commercial registrationCurrent registration and the activities it actually covers, matched against the work they do on your site.On expiry
Licences and approvalsThe trade-specific licence the work requires, held against the work the vendor actually performs on your site.On expiry
InsurancePolicy, cover and expiry date, with a reminder ahead of renewal rather than a discovery after it.On expiry
Competence evidenceCertificates and authorisations for the specific work, held per person where the task requires a named individual.On expiry
Site induction and permitsWho has been inducted, what permits have been issued, and whether the permit was closed.Per visit
Visit and finding historyEvery attendance with what was found and whether the recommendation was acted on. An unactioned recommendation is a live risk with a date on it.Per visit
PerformanceAttendance against schedule, response against target, and recurring findings, reviewed with you.Monthly
03

Outputs

01

The vendor register

Every contractor with access to your site, their scope, their documents and their dates. One page that answers the question nobody can currently answer.

02

The expiry calendar

Insurance, registration and certificate expiries dated across the year with reminders, so renewal is a task rather than an incident.

03

The assessment record

What was checked before a vendor was allowed on site, by whom, and what conditions were attached.

04

The consolidated performance view

Attendance, response and open findings across every vendor in one table, rather than in eleven separate reports in eleven formats.

05

The open findings list

Recommendations made by any vendor, with an owner and a date. This is the list that matters after an incident.

04

Building the register

  1. 01

    Find everyone

    Gate logs, invoices, security records and the maintenance team's memory, cross-checked. The invoice ledger usually finds two contractors nobody mentioned.

    Week one
  2. 02

    Collect and check documents

    Registration, insurance and competence evidence requested with a deadline, then checked against the work they perform rather than just filed.

    Week two
  3. 03

    Reconcile scope to reality

    What the contract says against what they actually do and how often. Gaps and overlaps both show up here, and overlaps are usually worth money.

    Week three
  4. 04

    Run it forward

    Visits booked against the register, permits issued through one route, findings tracked to close, and a monthly review of the whole set.

    Ongoing
05

The roof leak that found a lapsed policy

A shopping mall in Riyadh has seventeen contractors on site, from escalators to cleaning to signage. The operations manager learns during a roof leak that the waterproofing contractor's insurance lapsed four months earlier.

In week one the invoice ledger turns up two contractors nobody listed: an automatic door company and a pest provider serving one food court tenant. Documents are collected against a deadline. Three vendors have expired documents, and one holds a commercial registration whose activities do not cover the work it does on site. Scope reconciliation finds two contractors both cleaning the same car park.

The mall holds a register of nineteen vendors with scope and documents, an expiry calendar with reminders, an assessment record per vendor, a consolidated performance view and an open findings list. The car park overlap is removed at the next renewal.

06

How this works in practice

Q01

Do we have to replace our existing contractors?

No, and we would usually advise against it as a first move. A specialist who knows your plant is worth keeping. What changes is that their scope is written down, their documents are current, and their visits are verified rather than assumed.

Q02

What if a vendor will not provide their documents?

Then they are on the register with that gap visible, and you decide. We will not sign someone onto site with missing insurance and we will not quietly leave the field blank. A vendor refusing to evidence their cover is telling you something useful.

Q03

Can this work if we do not use ITF for the maintenance?

Yes. The register, the assessment and the consolidated reporting can be run over vendors we have nothing else to do with. It is a reasonable way to test whether the discipline is real before handing over anything operational.

Q04

How is this different from what our procurement team does?

Procurement appoints and pays. This is about what happens between appointments: whether the visit occurred, whether the document is still valid, and whether the recommendation from eighteen months ago was ever actioned. Those three questions are rarely anybody's job.

Book a site survey

Start by asking your team for the list. However long it takes them to produce it is the measurement, and the survey turns the answer into a register.

Book a site survey