ITF Consult

Audits of your suppliers and contractors

We audit the companies you buy from against your requirements and give you a scored report you can act on.

Audited against
Your requirements, a standard or a scheme you name
On site
Process walk, record sampling and interviews
Report
Scored by section, findings in three parts
Closure
Each supplier response closed or rejected
Coverage
Riyadh and the Eastern Province, elsewhere on request

A second-party audit is an audit you commission of a supplier or contractor, against your own requirements or a standard you name. We plan it, carry it out on site, and write a scored report with findings the supplier must close.

A specimen supplier audit report with sections such as cold chain records, allergen control, pest control and traceability down the side, each marked met, partly or not met, with three findings flagged; the traceability finding is opened into requirement, evidence, gap and response date, and a strip below shows the supplier's response reviewed and then closed or rejected before the buyer's approval decision.SUPPLIER AUDIT REPORT, SPECIMENSECTIONMETPARTLYNOT METFLAGCOLD CHAIN RECORDS1ALLERGEN CONTROLPEST CONTROLTRACEABILITY2CLEANING AND HYGIENEINCOMING MATERIALS3TRAINING RECORDSSCOREPER SECTION AND OVERALLBEFORE THE VISITCRITERIAAGREED WITH YOUPLANSENT TO SUPPLIERFINDING 2, IN THREE PARTSREQUIREMENTYOUR CRITERIONEVIDENCETRACE TEST, DATEDGAPLOT NOT TRACEDRESPOND BYDATE IN REPORTAFTER THE REPORT: WHERE FINDINGS CLOSE OR GO BACKSUPPLIER RESPONDSCAUSE, ACTION, EVIDENCEWE REVIEWAGAINST THE EVIDENCECLOSED OR REJECTEDWITH THE REASONYOUR DECISIONAPPROVE OR HOLDA REJECTED RESPONSE GOES BACK TO THE SUPPLIER
A scored supplier report, one finding openedThen the step where findings close or go backSwipe to pan
01

A questionnaire is not an audit

Supplier approval often runs on a self-assessment questionnaire. The supplier ticks yes, attaches a certificate, and the form goes in a file.

A questionnaire tells you what the supplier says. An audit tells you what the supplier does. The difference shows up in the cold room log with days missing, the allergen changeover skipped on the night shift, and the lot that cannot be traced back to its raw material.

A certificate does not close that gap either. It says a system was assessed against a standard on certain dates. It does not say the supplier meets your specification, your labelling rules or your delivery conditions, which is why a second-party audit is written against your requirements and not only against the standard.

The last failure is closure. The report goes to the supplier, the supplier replies that everything is fixed, and nobody checks. A finding is closed when the evidence has been seen, and not before.

02

What we audit against

Criteria are agreed before the visit. An audit without agreed criteria is an opinion.

CriteriaWhen it fits
Your own supplier requirementsYou have a specification, a supplier manual or contract terms, and you want to know whether the supplier meets them.
A management system standardYou want the supplier's quality, environmental or safety system checked against ISO 9001, 14001 or 45001.
A food safety schemeThe supplier handles food or packaging, and you need HACCP, ISO 22000 or scheme requirements checked in the plant.
A checklist you provideYour customer or head office has a set checklist, and we audit to it as written.
None yetWe build the criteria with you first, from your specifications and the risks in what you buy.
03

The papers you get

01

The audit plan

Sent to the supplier before the visit with the date, the scope, the criteria and who will be interviewed.

02

The scored report

A score per section and overall, against the criteria agreed with you, with the evidence behind each score.

03

The finding list with deadlines

Each finding written in three parts, requirement, evidence and gap, with the date the supplier must respond by.

04

The corrective action review

Each supplier response checked against evidence and marked closed or rejected, with the reason for any rejection.

04

How the audit runs

  1. 01

    Criteria

    Agreed with you: what the supplier must meet, and how the score is weighted.

    Before the plan
  2. 02

    Plan

    Sent to the supplier with the date and scope, so the right people and records are there on the day.

    Before the visit
  3. 03

    On site

    Process walk, records sampled, interviews with the people doing the work, and at least one delivered lot traced back to its inputs.

    On the day
  4. 04

    Report

    Scored, with findings written in three parts and a response deadline on each.

    After the visit
  5. 05

    Corrective actions

    The supplier's responses reviewed and closed or rejected. A rejected response goes back with the reason.

    Until closed
05

A new chilled supplier, approved on evidence

A food retailer is approving a new supplier of chilled products and wants more than a questionnaire before the first order.

We audit the supplier's plant against the retailer's own checklist and food safety requirements. The day covers cold chain records from intake to dispatch, allergen control and changeover, pest control, and traceability, tested by following one delivered lot back to its raw materials.

The report gives a score per section and overall. Each finding goes to the supplier in three parts with a deadline. The responses come back to us, and we check each one against the evidence it cites.

The retailer holds the scored report, the finding list and a record of each response accepted or rejected. The approval decision is the retailer's, taken once the findings are closed.

06

Four reasons buyers commission one

Before you approve

Before the first order, so the approval rests on what was seen at the site and not on what the supplier said about it.

  • Criteria set from your specification
  • A scored report to file with the approval
  • Findings closed before the first order
07

Questions about the supplier's side

Q01

Can you audit suppliers outside Riyadh and the Eastern Province?

Tell us where and we will say whether we can. The plan and the travel are agreed before anything is booked.

Q02

Do suppliers have to agree?

Yes. A second-party audit happens with the supplier's cooperation, usually as a condition of your contract or approval. We send the plan ahead so the supplier knows what will be looked at.

Q03

Is this the same as certification?

No. It is your audit of your supplier, against your requirements. It certifies nothing, and a supplier's certificate does not replace it.

Q04

Can our own staff come on the audit?

Yes, and it is a good way to build your own supplier audit capability. Your people observe on the first visits and can lead later ones with us alongside.

Q05

Can you audit contractors working on our site?

Yes. A contractor audit looks at the permits, competence records, method statements and supervision behind the work, as well as the work itself.

Q06

Who decides whether the supplier is approved?

You do. The report gives the score, the findings and the status of each response. The approval decision stays with the buyer.

Audit the supplier before the first order

Send us your supplier requirements or the checklist you use. We will come back with the criteria, the plan and a date.

Book a supplier audit