ITF FM

How we run a facility

Four moves, repeated: define the site as a system, run it to checklist, record what happened, and let the record change the next cycle.

Method
Define, run, record, review
Evidence
Captured at the point of work
Review
Monthly, against the record
First full cycle
Complete by day 30
Coverage
On site across Saudi Arabia

We run buildings the way management systems are audited. The site is defined as assets, zones, routines, risks and owners. Work runs to a checklist. Evidence is captured at the point of work. The monthly review changes the schedule, and a review that changes nothing was a presentation.

Four operating moves arranged as a closed loop: define, run, record and review, with the artifact produced on each arrow between them, and the review back into define highlighted as the link that closes the cycle.DEFINEASSETS, ZONES, ROUTINES, OWNERSRUNCHECKLIST AND PRIORITY CLOCKRECORDAT THE POINT OF WORKREVIEWTHE RECORD, READ TOGETHERTHE SCHEDULECLOSED WORK ORDERSTHE MONTHLY REPORTTHE ACTION LISTONE MONTHA REVIEW THAT CHANGES NOTHING WAS A PRESENTATIONTHE NEXT SCHEDULE IS DIFFERENT, OR THE LOOP DID NOT CLOSE
Define, run, record, reviewThe loop only closes at reviewSwipe to pan
A thirty day strip showing what lands on which day of a facilities month: planned maintenance on the asset interval, statutory tests, inspection rounds, reactive work arriving unplanned, and the close on the last two days where the record becomes the pack and the monthly report.ONE MONTH, DAY BY DAYW1W2W3W4W5010203040506070809101112131415161718192021222324252627282930PLANNED MAINTENANCEON THE ASSET INTERVALSSSSSTATUTORY TESTON THE STATUTORY INTERVALTTTTINSPECTION ROUNDWALKED, SCORED, PHOTOGRAPHEDRRRRREACTIVENO INTERVAL. DATED AS IT LANDS.THE CLOSETHE SAME DATE, TIDY MONTH OR NOTPRTHE MARKSS PLANNED VISITT STATUTORY TESTR INSPECTION ROUNDREACTIVE CALLP THE PACKEVERY CLOSED TICKET, READING AND PHOTO FROM THE ROWS ABOVER THE REPORTASSEMBLED, NOT TYPEDTHE ROLL-UP IS READ WITH YOU IN THE FIRST WEEK OF THE NEXT MONTH, AND IT CHANGES THE NEXT SCHEDULE.
The monthIndicative pattern. Yours is set at mobilisation.Swipe to pan
01

Where FM providers actually lose

The work usually gets done. What fails is the part after it, and the part after that is what you are paying for.

Almost every facilities complaint we have inherited traces to a missing handoff rather than a missing skill. A task was completed and not recorded. A defect was mentioned and not ticketed. A recommendation was made and never given an owner. Nobody was lazy. The chain just had no link at that point.

This is the same failure we spend our professional lives finding inside other companies' management systems, which is why our own operation is built around closing it. Not because documentation is virtuous, but because an unrecorded month cannot be reviewed, and a month that cannot be reviewed repeats.

It also means we will show you the bad numbers. A report where everything went well every month is a report nobody is reading.

02

The four moves

MoveWhat it means in practiceOutput
DefineThe building is turned into a list: assets, zones, routines, risks and the person who owns each one. Nothing gets scheduled against a building, only against an item on that list.Survey and mobilisation
RunPlanned work executes to a checklist and reactive work runs to a priority with a clock. Neither depends on which technician showed up.Daily
RecordEvidence is captured where the work happens, not written up afterwards. Photographs, readings, times and names, attached to the asset or the zone.At the point of work
ReviewThe month is read together and something changes: a frequency, a scope line, a roster, a priority level. A review that changes nothing was a presentation.Monthly
03

What the method produces

These are the same artifacts named on every service page, because the method does not change between service lines.

01

The asset and zone register

The definition of your site as a system. Everything else in the contract points at a line in it.

02

The schedule

Planned work placed on dates, per asset or per zone, visible a year ahead.

03

The evidence trail

Work orders with photographs, readings, times and names, queryable by asset rather than by month.

04

The monthly report

Assembled from the record rather than written at month end, which is why it arrives on time and is not flattering.

05

The action list

What the review decided, with an owner and a date, carried forward until it closes.

04

The first month on a warm office building

An office building in Khobar changes provider after a summer of cooling complaints. The outgoing contractor hands over an equipment list and a folder of service sheets with ticks on them.

Define comes first. The survey walks every floor and the roof and lists air handling units, fan coils and split units by location, with the person who owns each zone. Units that were never on the old list are added, and units on the list that no longer exist are removed. Run starts from that register: planned tasks go on the calendar, and every complaint becomes a ticket with a priority and a clock.

Record happens at the unit. Filter pressure, supply temperature and the technician's photographs are attached to the asset, not typed up at month end. By the first review, the record shows the same two fan coils on the top floor tripping again and again, and complaints clustering on that floor after midday.

The review changes two things: the filter interval for that floor is shortened, and a replacement case is raised for the two units with their repair history attached. The client holds the register, the calendar, the ticket history, the first monthly report and an action list with an owner and a date against each change.

05

What this looks like from your side

You stop being the record system

The most common thing we replace is a person holding the whole building in their head and in a spreadsheet. That works until they take leave.

  • Every routine and every defect has a place it lives that is not your inbox
  • One monthly document instead of assembling five vendor reports
  • A handover that survives you being away for two weeks
06

Fair challenges to this

Q01

Is this just paperwork with a different name?

It is paperwork if nothing reads it. The test is whether the review changes the schedule. If we hand you a monthly report for six months and nothing about the operation has changed, then yes, it was paperwork, and you should say so at the review.

Q02

Our building is small. Is this overkill?

The register and the schedule scale down honestly, and on a small site they take a day to build. What does not scale down is the value of knowing what is on the roof. Small buildings usually have worse records than large ones, not better.

Q03

We already have a CAFM system nobody uses. How is this different?

A system is not a method. The reason most CAFM deployments go quiet is that nobody defined the site first, so the tool had nothing true to hold. We would rather spend the first two weeks on the register than on software configuration.

Q04

Will you show us the months that went badly?

Yes, and that is the part of this you should test us on. Ask for a month where the completion rate dropped and see whether we can produce it with the cause written next to it.

Q05

Does the method change between service lines?

No. The same four moves run on every line, from HVAC to pest control to support staffing, which is why every service page names the same kinds of documents.

Book a site survey

The survey is the define step, done once. The register and the draft schedule that come out of it are what the quote is written against.

Book a site survey