ITF FM

Glass and cladding, cleaned safely at height

External glazing and cladding cleaned from the ground, with water-fed poles and from powered access, with rope access through a certified specialist we manage.

Methods
Ground, water-fed pole, powered access, BMU, rope access
Rope access
Managed specialist, certified
Frequency
A base cycle plus cleans after major dust events
Anchors
Used only with a current inspection certificate
Summer midday
No work in direct sun 12:00 to 15:00, 15 June to 15 September

Façade and window cleaning removes dust, salt and staining from external glazing and cladding. Low and mid-rise work is done by our crew from the ground, with water-fed poles or from powered access platforms. High-rise rope access is managed specialist work: a certified rope access company does it, and ITF plans, supervises and records it.

The shared facility section with the façade layer drawn on it: the building's outside wall marked by cleaning method, with rope access on the top level, water-fed poles on the middle levels and ground work at the base, a certified anchor on the roof and a fenced exclusion zone at the foot of the wall.SECTION A-A / SAME SITE, ONE LAYER SHOWNL3L2L1B1YARD AND PERIMETEREXTERNALROPE ACCESS, MANAGEDWATER-FED POLEGROUND AND LADDERSACERTIFIED ANCHOREXCLUSION ZONEBEFORE THE FIRST DROPMETHOD STATEMENTWRITTENANCHORSCERTIFICATE CURRENTBASE OF DROPFENCEDWIND LIMITIN THE STATEMENTSUMMER MIDDAYNO WORK IN SUNWORK STOPS AT THE WIND LIMITROPE ACCESS, CERTIFIED SPECIALISTPOLE AND GROUND: OUR CREWDASHED BOX: EXCLUSION ZONENO WORK UNDER DIRECT SUN 12:00 TO 15:00, 15 JUNE TO 15 SEPTEMBER.ONE SITE, DRAWN ONCE. EVERY FM PAGE SHOWS THE SAME BUILDING WITH ONE LAYER ON IT.
The façade layerMethod by heightSwipe to pan
A twelve-floor building elevation divided into seven vertical drops. Each drop hangs from a roof anchor carrying a certificate tag, with a rope line down the upper floors for rope access and water-fed poles on the lower floors, an entrance canopy for powered access, and a fenced exclusion zone along the base. One drop carries a flag for a sealant failure, photographed and reported. A panel lists the method used at each height and who does it.ANCHOR, CERTIFICATE TAGGEDROPE ACCESS, MANAGEDWATER-FED POLECANOPYSEALANT FAILUREPHOTOGRAPHED, REPORTEDEXCLUSION ZONE AT THE BASE OF EACH DROP, FENCEDD1D2D3D4D5D6D7METHOD BY HEIGHTROPE ACCESSMANAGED SPECIALISTBMUIF CERTIFIEDPOWERED ACCESSCANOPY, ATRIUMWATER-FED POLELOW, MID-RISEGROUND, LADDERSSHOPFRONTSCREW BELOW, SPECIALIST ABOVE
One elevation, method by heightAnchors tagged, base fencedSwipe to pan
  1. 01 Enquiry
  2. 02 Site survey
  3. 03 Scope and quote
  4. 04 Mobilisation
  5. 05 Planned schedule
  6. 06 Execution
  7. 07 Monthly report
  8. 08 Management review
  9. 09 Next cycle

Glass and cladding, cleaned safely at height sits at step 6 of the fm operating cycle. You receive closed work orders with photo evidence.

01

Climate sets the frequency

Inland in Riyadh, a single dust event can grey a clean façade in an afternoon.

On the coast in Khobar and Dammam, salt settles on the glass and gets harder to shift the longer it stays. So a fixed calendar is only half the answer.

We set a base cycle for your building and add a clean after major dust events, because a showroom or a head office cannot look abandoned for two months waiting for its next slot.

02

Method by height

MethodWhere it fitsWho does it
Ground level and laddersShopfronts, ground floor glazing, canopies.Our crew
Water-fed pole with purified waterLow and mid-rise glazing, spot-free without chemicals.Our crew
Powered access platformsAtriums, canopies, low-rise elevations, signage.Our crew, with trained operators
Building maintenance unitTowers fitted with a gondola.Trained operators; the unit's inspection tracked by us
Rope accessHigh-rise elevations without a BMU, or areas a BMU cannot reach.Managed specialist: a certified rope access company
03

The file behind the clean glass

01

The façade cleaning plan

Every elevation divided into drops, with the method and the access equipment chosen for each.

02

The method statement

Written before anyone goes up, with the anchor and equipment certificates attached.

03

The cleaning record

Photographs per drop, so each part of the building can be checked against the plan.

04

The BMU and anchor inspection dates

Each certificate's due date, tracked so a lapsed one is found before the next clean.

05

The façade defect report

Sealant failures, cracked panes and loose cladding, photographed and located by drop.

04

The safety plan comes first

Work at height is planned in writing before anyone goes up.

  1. 01

    Method statement

    Method and access equipment written for each elevation, with the certificates attached.

    Before
  2. 02

    Anchors

    Roof anchors are checked against their inspection certificates. An anchor with no current certificate is not used.

    Before
  3. 03

    Exclusion zone

    The base of each drop is fenced, so nobody walks under the work.

    On site
  4. 04

    Wind limits

    Wind limits are written into the method statement, and work stops when they are exceeded.

    On site
  5. 05

    Summer hours

    From 15 June to 15 September, the Ministry of Human Resources and Social Development bans work under direct sunlight between 12 noon and 3 pm. Outdoor drops are planned around it.

    June to September
05

A corniche tower before an opening

A twelve-storey office building on the Khobar corniche has a salt film on its seaward elevation and a gondola whose inspection certificate expired last year. The landlord wants the building clean before a tenant's opening event.

We use water-fed poles on the lower floors and powered access for the entrance canopy. Because the gondola cannot be used until it is inspected, the upper elevations go to a certified rope access specialist, working from anchors whose certificates we check before the first drop. The base of each drop is fenced, and work is planned around the afternoon sea breeze. The crew reports two failed sealant runs and one cracked pane.

The landlord holds a façade cleaning plan by elevation, the method statement with anchor certificates attached, a cleaning record with photographs per drop, the gondola inspection booked with its due date in the vendor register, and a defect report for the sealant and the pane.

06

More than glass

Everything on the face of the building

Frames and seals, cladding panels, signage, canopies, skylights and, where fitted, rooftop solar panels on their own cycle.

07

Asked before the first drop

Q01

How often should our windows be cleaned?

It depends on the building's exposure and its use. A base cycle plus cleans after major dust events is the usual answer.

Q02

Is rope access safe?

Done by certified technicians, from certified anchors, with a written plan and an exclusion zone, yes. That is why it is managed specialist work, delivered by a certified rope access company.

Q03

Can you use our building maintenance unit?

Yes, with trained operators and a current inspection certificate. If the certificate has lapsed, the unit stays parked until it is renewed.

Q04

Can you clean during working hours?

External work, usually yes. Inside atriums and above entrances, we plan around footfall.

Q05

Do you repair the defects you find?

Small sealant and glazing repairs can be quoted as works. Cladding faults go to the façade specialist.

Book a façade survey

The survey walks each elevation, checks the roof anchors and any gondola against their certificates, and picks a method for every drop. The plan comes before the quote.

Book a façade survey