Standby power that has actually been tested

Generators, transfer switches, batteries and fuel maintained on a calendar and proved by running under load, not by starting and stopping.

Scope
Diesel standby sets, transfer switches, batteries, fuel
Run test
Monthly, on load where the site allows
Load bank test
Annual, where building load cannot be used
Survey to schedule
Within two weeks
Overhaul and warranty
Managed specialist

Standby generator maintenance keeps backup power ready for the day the grid fails: batteries, fuel, coolant, the transfer switch and the engine itself, proved by regular runs under load. ITF keeps a run log per set. Major overhauls and warranty work stay with the manufacturer or its agent as managed specialist work.

The shared facility section with the standby power layer drawn on it: the utility supply and the standby set in the yard both feeding a transfer switch in the basement, the essential board beside it, and essential circuits rising to the server room and the emergency loads on each level.SECTION A-A / SAME SITE, ONE LAYER SHOWNL3L2L1B1YARD AND PERIMETEREXTERNALUTILITYATSTRANSFER SWITCHSTANDBY SET G-01DIESEL, IN THE YARDESSENTIAL BOARDEMERGENCY LOADSEMERGENCY LOADSSERVER ROOMWHAT AN ON-LOAD RUN RECORDSLOADAS A VALUEVOLTAGEAS A VALUEFREQUENCYAS A VALUETEMPERATURESAS VALUESDURATIONSTART TO STOPTRANSFERPROVED BOTH WAYSONE LOG PER SETSTANDBY PATHUTILITY AND ESSENTIAL CIRCUITSA SET THAT STARTS HAS PROVED IT STARTS. CARRYING THE BUILDING IS THE TEST.ONE SITE, DRAWN ONCE. EVERY FM PAGE SHOWS THE SAME BUILDING WITH ONE LAYER ON IT.
The standby layerYard set, transfer switch, essential boardSwipe to pan
A single-line diagram of a utility supply and a standby generator both feeding a transfer switch, which feeds the essential board, with a numbered six-step test path from opening the utility supply to the cool-down run, each step with a check box and a time. Beside it, a diesel tank in section with a water layer at the bottom, its drain point, and the fuel record.UTILITY SUPPLYINCOMERSTANDBY SET G-01DIESELTRANSFER SWITCHATSESSENTIAL BOARDEMERGENCY LOADS123456THE TEST PATH, IN ORDER1UTILITY SUPPLY OPENEDTIME2SET STARTSTIME3LOAD TRANSFERS TO THE SETTIME4LOAD CARRIED, METERS READTIME5RETRANSFER TO UTILITYTIME6COOL-DOWN RUNTIMEDIESEL TANK, IN SECTIONLEVEL, CHECKED AGAINST THE LOGDIESELWATER LAYERWATER AND MICROBES SETTLE HEREDRAIN POINTDRAINED AND SAMPLEDFUEL RECORD / TANK OF G-01WATERDRAINED, DATEDSAMPLERESULT RECORDEDTANK AND BUNDINSPECTEDPOLISHINGWHERE THE SAMPLE FAILSDELIVERIESLOGGED TO THE TANK
The on-load test pathSix steps, each with a box and a timeSwipe to pan
  1. 01 Enquiry
  2. 02 Site survey
  3. 03 Scope and quote
  4. 04 Mobilisation
  5. 05 Planned schedule
  6. 06 Execution
  7. 07 Monthly report
  8. 08 Management review
  9. 09 Next cycle

Standby power that has actually been tested sits at step 5 of the fm operating cycle. You receive the annual planned maintenance schedule.

01

Why standby sets fail on the day

Standby generators rarely fail because the engine is worn out. They fail because of something small that nobody tested.

The starter battery is four years old. Water has condensed into the diesel tank, which on the humid coast happens faster than people expect, and microbial growth has started blocking the filters. The transfer switch has not actually transferred since commissioning.

Or the set has been run every month for ten minutes with no load. That leaves unburnt fuel and carbon in the exhaust, a condition called wet stacking, and the set struggles the first time it has to carry the building.

02

The calendar

Intervals start here and move with the manufacturer's guidance, the duty the set actually sees and your own risk decision.

CheckWhat is doneInterval
Visual roundFuel level, leaks, battery charger status, alarms, enclosure and louvres, done by site staff to our checklist.Weekly
Run testStart, run and stop recorded, on load wherever the site can take a transfer.Monthly
BatteriesVoltage, electrolyte or condition and terminals checked, with the installation date logged.Monthly, replaced on date
ServiceOil, filters, belts, coolant condition and heaters, and the radiator cleaned of dust.To the manufacturer's hours, or annual
Transfer switchMechanical operation checked, and a full transfer and retransfer proved.Quarterly, or with each on-load run
FuelWater drained, a sample checked, tank and bund inspected, and polishing arranged where the sample is bad.Quarterly sample
Load testA load bank test where the building load is too light, or too sensitive, to use.Annual
Overhaul and warranty workMajor overhauls, control faults on synchronised or paralleled sets, and anything under warranty, done by the manufacturer or its authorised agent. We schedule the visit, supervise it and keep their report in the same record. Managed specialist work.To the manufacturer's schedule
03

The records per set

01

The generator run log

Every run with load, voltage, frequency, temperatures and duration. A run with no load is recorded as exactly that.

02

The transfer test record

Each transfer and retransfer with its time, and anything the switch did that it should not have.

03

The battery record

Condition and voltage per visit, and the installation date, so a battery is replaced on a date rather than after a failed start.

04

The fuel record

Water drained, sample results, tank and bund condition, and every delivery logged against the tank, so the level in the log and the level in the tank agree.

05

The service sheet

One per visit: oil, filters, belts, coolant, heaters and radiator, against the manufacturer's hours.

06

The annual load test report

The set run at a planned load for a planned duration, on building load or a load bank, with the readings.

04

On load, or it is not a test

Starting a generator proves it starts. It does not prove it can carry your building, or that the transfer switch will move the load across and back.

  1. 01

    Plan the window

    A date agreed, the people who own the loads told in advance, and a written plan for what happens if the set does not pick up.

    Before
  2. 02

    Open the utility supply

    The set starts and takes the load through the transfer switch. Where the building load is too light or too sensitive to use, a load bank carries the test instead.

    Transfer
  3. 03

    Carry and record

    The set runs on load while load, voltage, frequency and temperatures are logged against time.

    On load
  4. 04

    Hand back

    Retransfer to the utility supply, a cool-down run, and the log closed with the duration and anything the set or the switch did wrong.

    Retransfer
05

A set nobody had seen carry load

A Riyadh office relies on one standby set for its server room and emergency loads. The site guard starts it for ten minutes every month and signs a sheet. Nobody has seen it carry load since handover.

We plan an on-load transfer for a Friday morning with the client's IT team present. Before it, we check the battery, which is four years old and low under cranking, and sample the fuel, which has water at the bottom of the tank. The battery is replaced and the tank drained and polished.

On the day, the transfer switch hesitates on retransfer and its contacts are found worn. The switch is repaired and retested the following week.

The client holds a run log with load and duration, a transfer test record, fuel sample results before and after polishing, a battery record with the new installation date and a repair record for the switch.

06

Questions before the next outage

Q01

How often should a standby generator run?

A monthly run is a common starting point, and it should carry load wherever the site can take a transfer. The manufacturer's guidance and your own risk decide the final regime.

Q02

Is a monthly no-load run harmful?

Repeated light or no-load running can cause wet stacking: unburnt fuel and carbon building up in the exhaust. It is one reason we push for on-load runs and an annual load bank test.

Q03

Who supplies the fuel?

Usually your own fuel supplier. We drain the water, check the fuel's quality and record every delivery against the tank in the log.

Q04

Our generator is under OEM warranty. Can you still help?

Yes. The manufacturer keeps the warranty work, and we run the weekly and monthly checks their terms allow and hold their reports in your file.

Q05

Do you maintain UPS systems too?

UPS batteries and inverters are usually maintained by the manufacturer or a UPS specialist. We manage that specialist as managed specialist work and log their visits beside the generator's.

Book a site survey

Ask when the set last carried the building's load. If nobody can answer, the survey starts there: the battery, the fuel, the transfer switch and a plan for the first on-load test.