Mechanical, electrical and plumbing works

Maintenance and works across the three services, run under method statements, permits and supervision rather than on trust.

Disciplines
Electrical, plumbing and sanitary, HVAC
Control
Method statement and permit before work
Survey to method statement
Five working days
HV, lifts, suppression
Managed specialist
Coverage
On site across Saudi Arabia

MEP covers the mechanical, electrical and plumbing systems that make a building usable. ITF maintains them and carries out defined works on them, with a method statement and a permit before work starts and a record after it finishes. High voltage, lifts and suppression are managed specialist work.

The shared facility section with the mechanical, electrical and plumbing layer drawn on it: three risers sharing the core from the basement plant to the roof deck, and the permit gate that controls access to any of them.SECTION A-A / SAME SITE, ONE LAYER SHOWNL3L2L1B1YARD AND PERIMETEREXTERNALELECTRICALRISING BUSBARPLUMBINGDOWN-FEED AND STACKHVACSUPPLY AND RETURNB1 PLANTPERMIT AND ISOLATIONLOCKED, PROVED, PHOTOGRAPHEDNOTHING CROSSES WITHOUTWORKS REQUESTSYSTEM, DOWNTIMEMETHOD STATEMENTAPPROVED BY YOUPERMITISSUED AND TIMEDISOLATIONLOCKED AND PROVEDHAND BACKTESTED AND SIGNEDNOT ON THE PERMIT, NOT TODAYTHREE SERVICES SHARE ONE SHAFT, SO ONE ISOLATION AFFECTS THREE SCOPESTHAT IS WHY THE GATE IS DRAWN ON THE RISER AND NOT IN A POLICY DOCUMENT.ONE SITE, DRAWN ONCE. EVERY FM PAGE SHOWS THE SAME BUILDING WITH ONE LAYER ON IT.
The MEP layerThree risers, one gateSwipe to pan
A building section with electrical, plumbing and HVAC risers running from a basement plant room through three levels, beside a five step control chain from works request to hand back, with the permit and isolation step highlighted.LEVEL 03OCCUPIEDLEVEL 02OCCUPIEDLEVEL 01OCCUPIEDB1 PLANT ROOMSOURCEELECPLUMBHVACMAIN DBPUMP SETCW PLANTEVERY LEVEL, THREE SERVICESTHE CONTROL CHAINWORKS REQUESTTASK, SYSTEM, DOWNTIMEMETHOD STATEMENTISSUED FOR YOUR APPROVALPERMIT AND ISOLATIONLOCKED, PROVED, PHOTOGRAPHEDWORK EXECUTEDTO THE STATEMENT, NOT AROUND ITHAND BACKTESTED, PERMIT CLOSED, RECORDEDA TASK NOT ON THE PERMIT DOES NOT HAPPEN THAT DAY
Risers and the permit gateNothing crosses it without a method statementSwipe to pan
  1. 01 Enquiry
  2. 02 Site survey
  3. 03 Scope and quote
  4. 04 Mobilisation
  5. 05 Planned schedule
  6. 06 Execution
  7. 07 Monthly report
  8. 08 Management review
  9. 09 Next cycle

Mechanical, electrical and plumbing works sits at step 6 of the fm operating cycle. You receive closed work orders with photo evidence.

01

The part that gets skipped

Almost every MEP incident on a live building traces back to a control that was skipped because it felt like paperwork.

Isolation not proved. A valve closed but not locked. A hot works permit that nobody issued because the job was only going to take ten minutes. The technical work is usually competent. The control around it is what fails.

The second pattern is scope drift. A team is on site for a filter change, someone asks them to look at a leaking flange while they are there, and now unplanned work is happening on a system nobody isolated, with no record of who touched what.

So we work to a method statement and a permit, and a task that is not on the permit does not happen that day. It is slower on the morning and faster over the year.

02

The three disciplines

Each has its own page with the detail. This is what the combined service covers and where the boundaries sit.

DisciplineTypical workBoundary
ElectricalDistribution board maintenance, thermographic survey, circuit testing, lighting and small power installation, fault finding.LV, from the site side of the incoming supply
Plumbing and sanitaryPumps, tanks, risers, drainage, fixtures, leak investigation, tank cleaning coordination.Site side of the meter
HVACAir handling units, fan coils, split and package units, chilled water plant, filters, coils and controls.Plant and distribution; duct cleaning is its own job
Fire alarm systemsInstallation and maintenance of fire alarm devices and equipment.Its own page
Specialist systemsHV, lifts, suppression, ELV and anything needing a specific licence, worked by licensed specialists to a scope we write, supervise and keep on the same record.Managed specialist
03

The paperwork that comes with the work

Three of these exist before the job starts. That is the point of them.

01

The method statement

How the task will be done, with the sequence, the isolation points, the tools and the people. Issued for your approval, not filed after the fact.

02

The permit

Signed on the day, naming the system, the isolation, the duration and the person in charge. Closed and returned when the system is handed back.

03

The risk assessment

The hazards for that task on that site, with controls. Generic assessments get rejected by our own supervisors before they reach you.

04

The work order record

What was found, what was done, which parts were used, photographs before and after, and who signed the system back into service.

05

The test and inspection log

Readings and test results against the asset, kept as a history rather than as loose certificates in a drawer.

04

How a works package runs

  1. 01

    Define the package

    The task, the system affected, the downtime needed and the access required. A package that cannot state its downtime is not ready to be scheduled.

    Before scheduling
  2. 02

    Issue the method statement

    Written for the specific task and sent for your approval. If your site has its own permit regime, ours folds into yours rather than competing with it.

    Five working days
  3. 03

    Isolate and prove

    Isolation applied, locked and proved dead or depressurised, and photographed. This is the step that stops the accident, so it is the step with the record.

    On the day
  4. 04

    Work and hand back

    The task executed to the statement, the system tested, the permit closed and the area returned in the state you would want to find it.

    Same shift
05

Three insurer findings, three weeks

An insurer's survey of a warehouse in Dammam raises three findings: hot terminations on two distribution boards, a leaking riser valve above a switchroom, and no record of RCD testing. The client has three weeks to respond.

We issue method statements within five working days. The board work is planned for a Friday shutdown: thermography first under load, then isolation, torque checks and re-termination, then a repeat scan. The riser valve is replaced under a plumbing permit with the switchroom protected below it. RCDs are tested and the results recorded as trip times per way.

The client sends the insurer a handover pack: before and after thermal images, the permit record, the RCD results table, the corrected board schedules and photographs of the new valve. The findings are answered with evidence rather than a letter saying the work was done.

06

Two ways this gets bought

MEP as a running service

A monthly presence, planned tasks on the calendar and reactive cover between them. This is the normal shape inside an O&M contract and it can be bought on its own.

  • Planned tasks drawn from the asset register and the manufacturer intervals
  • Reactive response against an agreed priority ladder
  • One technical supervisor who knows your plant rather than a rotating crew
07

Before the first permit

Q01

Who handles high voltage, lifts and suppression?

Licensed specialists, as managed specialist work. We write the scope, supervise the visit, hold their records and keep their dates on the same calendar as ours, so the file for the building stays in one place.

Q02

Will you work to our permit system?

Yes, and we prefer it. If your site runs a permit to work regime, ours becomes an input to yours. If you do not have one, we bring ours and you end up with a record of every isolation performed on your building, which is useful long after we leave.

Q03

Can you work during production or occupied hours?

Often, and sometimes it is the wrong idea. Whether work can happen live is a decision that belongs in the method statement, not in a phone call on the morning. Where it cannot, the task moves to a shutdown window and we tell you that at quote stage rather than on the day.

Q04

Who supplies materials?

Either party can. On maintenance contracts a consumables allowance is normal and anything above a threshold comes back to you with a quote. On defined works, materials are priced in the package and the specification is agreed before ordering.

Q05

Do you take on systems somebody else installed badly?

Yes, and the first output is usually a condition report rather than a maintenance schedule. Putting a planned calendar over a system with an installation defect makes the defect look maintained. We would rather tell you what we found and let you decide what to fix first.

Book a site survey

MEP problems are rarely one discipline. The survey looks at the plant, the distribution and the records together, and tells you which of the three is actually costing you money.