Facility management for factories

Maintenance planned around production, cleaning inside shutdown windows, and records several authorities can read.

A factory buys FM to protect output and to stay licensed. Planned work has to fit production windows, cleaning has to survive an inspection, and the evidence has to satisfy the industrial licence, the landlord authority, the environmental permit, Civil Defence and your customers' auditors.

A factory plan with production, utilities, warehouse and offices, four class A assets marked in production and utilities, a four-week production calendar with Friday and Eid windows marked for intrusive work, and six authorities on the right each fed from one monthly pack.THE PLANTPRODUCTIONDUST EXTRACTION ON THE LINEUTILITIESAIR, POWER, TX ROOMWAREHOUSEOFFICES AND WELFAREAAAAACLASS A: READINGS EVERY VISIT, SPARES ON SITEPRODUCTION CALENDAR, FOUR WEEKSFRIFRIFRIFRIEIDINTRUSIVE WORK GOES INTO THE MARKED WINDOWSEVERY VISIT RECORDED ONCEWHO READS THE RECORDMOIMRTHE INDUSTRIAL LICENCEMODON OR THE RCTHE LANDLORD AUTHORITYNCECTHE ENVIRONMENTAL PERMITCIVIL DEFENCEFIRE AND LIFE SAFETYSFDAFOOD, DRUG OR DEVICE PLANTSCUSTOMER AUDITORTHE MOST FREQUENT VISITORONE MONTHLY PACKTHE SAME RECORD, FOR EVERY READER
One plant, one record, six readersClass A assets decide the calendarSwipe to pan
01

What a plant manager is actually managing

Downtime is the currency. Every planned intervention competes with output, so maintenance that cannot state its duration does not get a window, and maintenance that overruns does not get another one. At the same time the plant carries a compliance load that has nothing to do with production: an industrial licence from the Ministry of Industry and Mineral Resources, an environmental permit, Civil Defence requirements, whatever your industrial city requires as landlord, and a customer audit programme on top. Several bodies, several formats, none of them accepting another's paperwork. The facilities team ends up assembling evidence several times over from the same underlying work.

  • Access windows are short, fixed and set by somebody other than the facilities team
  • The asset that stops the line is rarely the asset with the best records
  • Utilities, compressed air and effluent are production issues that arrive as FM tickets
  • Contractor access, permits and inductions multiply during a shutdown and stop being tracked
  • The evidence exists but sits in four systems, so producing it takes a week each time
03

Who asks you for what

The FM scope does not create any of these obligations. It decides how painful they are to evidence.

RequirementWhat it means on site
Industrial licenceIssued by the Ministry of Industry and Mineral Resources. Facility condition and safety provisions sit behind it, and the evidence for them is maintenance evidence.
Your industrial cityIn Dammam 1st, 2nd and 3rd the landlord and licensor is MODON. Inside Jubail and Ras Al Khair it is the Royal Commission, which runs its own environmental regime on top of the national rules.
Environmental permitThe National Center for Environmental Compliance outside Royal Commission cities. Waste routes, effluent and emissions evidence come partly from FM records.
Civil DefenceFire and life safety provisions on the premises. Detection and alarm maintenance records are the part of this that sits with us.
SFDAApplies if the plant makes food, feed, cosmetics, drugs or medical devices, and it changes the cleaning, pest and water records from useful to licence critical.
Customer auditsUsually the most frequent visitor. Buyers in the Aramco supply chain routinely require ISO 9001, and multinational buyers audit their suppliers' facilities directly.
04

What plant managers ask first

Q01

Can you work around our shutdown calendar rather than proposing your own?

That is the only way it works. The planned schedule is built after we see your production calendar, and where a task cannot fit a window we tell you at scope rather than discovering it in month four. Some tasks then have to be bought as shutdown packages instead of routine maintenance, and it is better to know that in advance.

Q02

Do you isolate our production equipment?

No. Your authorised person isolates and we work to that isolation under permit. We do not accept verbal confirmation that a machine is safe, and we will not touch a system your team has not formally handed over.

Q03

We are inside Jubail. Is that different?

Yes, materially. Inside a Royal Commission city the RC is landlord, municipality, environmental regulator and permit authority at once, and RCER requirements apply in addition to national ones. A provider who treats Jubail like Dammam finds that out on the first mobilisation.

Q04

Our records are spread across three systems. Do we have to migrate?

Not necessarily. The requirement is that closure produces evidence and that the evidence can be found by asset. If your existing system does that, we work in it. If it does not, migrating to a tool that does is a smaller job than most people fear, and the asset register is most of the work either way.

Q05

What does a typical engagement look like?

A building materials plant in Dammam 2nd Industrial City loses a day of output when a compressor and a transformer room fan fail in the same week of July, and its maintenance records live in three spreadsheets. The survey classes the compressor, the main LV board, the transformer room ventilation and the dust extraction fans as class A, with readings every visit and spares on site, and sets dust-driven filter intervals short. Intrusive work goes into the Friday and Eid windows, and the HV specialist and the crane inspector move into the vendor register as managed specialist work. The plant ends up holding an asset register with criticality, a calendar built around its windows, a vendor register with inspection dates and one monthly pack that answers its customer auditor and its insurer from the same record.

Q06

Can you support a customer audit at short notice?

The point of building the record continuously is that short notice stops mattering. What we will not do is assemble a retrospective evidence pack for work that was never recorded, because that is manufacturing, and both of us would be able to tell.

Book a site survey

On an industrial site the asset register is the most useful thing the survey produces: the list, the criticality and a draft schedule that fits your production calendar.

Book a site survey